Influence of artisans skill competency on construction projects completion success in Bauchi State Nigeria

Authors

  • Nura Muhammad Inuwa ATBU Bauchi Author

DOI:

https://doi.org/10.70882/2wwy2334

Keywords:

Skill competency in construction

Abstract

This study examined the influence of artisans’ skill competency on construction project completion success in Bauchi State, Nigeria, addressing persistent challenges of delays, cost overruns, poor workmanship and rework. It determined how technical, problem-solving, safety and quality competencies influence project success. A quantitative cross-sectional survey was adopted. Questionnaires were administered to 210 artisans and 30 site supervisors, achieving an 86% response rate. Descriptive statistics and multiple regression were employed. All competency dimensions were Moderate: Safety (2.82), Technical (2.76), Problem-Solving (2.66) and Quality (2.65). Critical gaps existed in standards compliance, high-risk safety, quality understanding and inter-trade coordination (Mean = 2.23, Low). Project success dimensions Budget (2.74), Quality (2.74), Time (2.61) and Stakeholder Satisfaction (2.56) were Moderate. The four dimensions explain 41.7% of variance in success (R² = 0.417, F = 36.28, p < 0.001); Technical (β = 0.287) and Safety (β = 0.241) were the strongest predictors. Competency significantly influences project success. Competency-based training, improved supervision, motivation and certification enforcement are recommended.

Downloads

Download data is not yet available.

Downloads

Published

2026-11-18

How to Cite

Influence of artisans skill competency on construction projects completion success in Bauchi State Nigeria. (2026). Journal of Pure and Applied Sciences (Science Forum), 26(5 (Special). https://doi.org/10.70882/2wwy2334

Similar Articles

11-16 of 16

You may also start an advanced similarity search for this article.